| A passage under the ground.
|
|
| To move earth and make a hole in the ground.
|
|
| It means ‘very-very big’, ‘huge’.
|
|
| A group of people who work together, or play a game together against another group.
|
|
| It means ‘in a position on the other side of something’.
|
|
| A person who is travelling in a car (bus, train, plane, etc.) but who is not driving it.
|
|
| It means ‘the floor of the sea’, ‘the bottom’.
|
|
| Something that transports people or things from place to place (cars, bicycles, lorries, buses).
|
|
| It means ‘in the space in the middle of two things – people, places, objects, etc.
|
|
| A long narrow piece of high land along the top of hills or mountains.
|
|
| To make something by putting pieces, materials, etc., together.
|
|
| It means ‘in a position that is below something’.
|
|
| A wall built across a river to hold back the water.
|
|
| A deep cut that is made through land and filled with water for boats or ships to travel along.
|
|
1.
| Look at this dam! It’s ………. !!!
|
|
2.
| A new modern ……… was built across the river.
|
|
3.
| A train disappeared into a ……… .
|
|
4.
| TBMs are used to ……… tunnels.
|
|
5.
| Which ……… has won the building project?
|
|
6.
| There was a beautiful building on the ……… side of the street.
|
|
7.
| What kind of ……… is used to transport TBMs?
|
|
8.
| The train goes ……… this tunnel in 5 minutes.
|
|
9.
| The bridge is not very high, so tall ships can’t pass ……… it.
|
|
10.
| A lot of ……… usually travel in the train through the tunnel.
|
|
1.
| The company has just finished building a new tunnel.
|
2.
| A new tunnel has just been designed by a group of young engineers.
|
3.
| Builders brought special equipment to dig the ground.
|
4.
| TBM is a special digging machine.
|
5.
| To build a tunnel builders dig the ground with the help of TBMs.
|
6.
| Builders need special equipment to dig tunnels.
|
7.
| TBM is an enormous machine.
|
8.
| Special enormous machines are used to dig tunnels.
|
9.
| It is important to work in a team.
|
10.
| This building was designed by a team of highly-skilled engineers.
|
11.
| These two buildings are located on opposite sides of the river.
|
12.
| Look! Our new Top Manager is sitting opposite the boss.
|
13.
| The Head of the Engineering Department was the first passenger on that train.
|
14.
| The first passenger train was designed many years ago.
|
15.
| Sometimes tunnels are built under the seabed.
|
16.
| Are you the owner of this vehicle?
|
17.
| What vehicles do you use to transport special equipment to a building site?
|
18.
| Tower Bridge goes across the River Thames in London.
|
19.
| The Millennium Bridge in Kazan goes over the Kazanka-river and joins the opposite sides of the city.
|
20.
| Building of dams is a very difficult but important process.
|
21.
| Safety is very important in the process of building tunnels, dams, etc.
|
22.
| Let me show you around the building site.
|
23.
| The ship went under the bridge.
|
24.
| The train goes through this tunnel in 7 minutes.
|
©2015 arhivinfo.ru Все права принадлежат авторам размещенных материалов.